Sunday, January 24, 2010

Concentration!

Just try and break the concentration of RAX connection building by Alex and Brad. Nic failed. But, wow, what a try.




Saturday, January 16, 2010

Flight Fabrication and Testing

It's an intense week for the RAX Team. Flight unit is due 27 January 2010. Andy and Eric are in DC for GPS testing. Thanks Orbital! The EPS team is over in S3FL thermal vac testing the EPS and the rest of RAX. Alex, Ben, and I are waiting for our flight boards from Matt and Advanced Circuits. Time to solder!